High Street

This project was a complete refurbishment to a 1st floor flat, including initial rip out and reconfiguration to the layout, complete re-wire and new heating system. After initial rip out it was found that the building was not watertight, works were required to the roof. Once the building was watertight, the completion of this project included decorations and installation of new flooring throughout.